MOQ 2 pcs · Standard models · Typical lead time ~15 days
📧 info@yoyangpower.com 📱 WhatsApp +86 173 1279 3518 ⚡ Typical reply within 24h
Home / Applications / Oil & Gas Field

Solar Power for Oil and Gas Well Pad Cameras

A well pad is small, fenced, fenced for a reason and visited on a schedule measured in days, not hours. Running power to each pad means trenching across lease roads for a load a light bulb would beat. Solar power for oil and gas well pad cameras keeps the point on its own pole instead, sized to ride the whole interval between pumper rounds, and the same arithmetic carries the valve and right-of-way points where off grid solar power for pipeline monitoring has to work without a visit at all.

Well pads and gates Pumper-round reserve MOQ 2 pcs FOB China
Solar panel and camera pole-mounted at a fenced well pad in desert country, with header piping and a storage tank behind
Illustrative scene, not a customer installation: a camera point on its own pole at a well pad, the panel fully visible above the fence.
Why pads stay off grid

The Pad Runs on Zero Hands Already

A well pad produces around the clock and is touched perhaps once or twice a week. Power follows people, and the pad has none: the tank battery, the separator and the injection skid carry their own supply arrangements, and the fence line has nothing between it and the nearest cable except lease road.

That emptiness is exactly why the camera question exists. A pad holds brass, copper, gauges and tubing that resell, behind a fence that is designed to slow a walk-through rather than stop one. A camera point answers it with the pad’s own logic: nothing to trench, nothing to fuel, and a reserve sized to the pumper’s round so the point never depends on an unscheduled visit.

Typical load

What a Well Pad Camera Point Actually Draws

Pad camera points are single-digit loads with long unattended stretches; the sizing question is the interval, not the equipment.

Device at the pointTypical continuous drawWatch for
Camera at the wellhead fence6–10 W typicalRuns every hour the pad runs, which is all of them
PTZ at a tank battery8–12 W typicalMovement draws more; night is when the point matters
Radio link to the field office≈8 W typicalOften the only path off the pad
Second camera or right-of-way node5–10 W typicalA different pole gets its own system; this line is one point

Reference values, not specifications. The label on your own equipment decides. Total continuous load at one point must not exceed 60 W (5 A at DC 12V).

A load that belongs elsewhere: actuators, chemical injection pumps, heated enclosures and anything on the process side carries its own power arrangement and its own rules. The 5 A output carries cameras, radio links and small accessories at a single point.
How it fits together

One Point, One Self-Contained System

Everything at a coverage point is powered from one standard system: panel, battery and outputs on the same pole or wall. The diagram shows how the pieces connect; the loads column is where your camera and router draw sits.

Solar panel e.g. 80 W mono array on YO-M8040 panel cable Charge controller over-charge protection charging Battery BMS protection DC 12V out max 5 A / 60 W total Camera at the wellhead fence 6–10 W typical PTZ at a tank battery 8–12 W typical Radio link to the field office ≈8 W DC plugs: 5.5 × 2.1 mm standard · 5.5 × 2.5 mm will not fit; check your camera plug before ordering

Total continuous load must not exceed 60 W (5 A at DC 12V). Recommended load depends on the actual draw of your cameras and router. Send us the models and we will check it for you.

Which model

Three Pad Situations, Three Standard Sizes

A wellhead camera on a short pumper round

YO-M8040: an 80W solar power system with a 40 Ah battery. Suits a fenced pad the pumper passes weekly, one fixed camera on the gate side and open desert sky above the array.

A tank battery that is watched, not visited

YO-P12060: a 120W solar power system with a 60 Ah battery. The standard choice where a PTZ covers the tanks and the loadout side, and the video leaves by radio to the field office.

A remote pad or right-of-way point

YO-P12060-T for the same power core on a heavy triangle bracket where the point stands in open wind, and YO-P240120 where the visit interval stretches past two weeks and the point has to hold a 120 Ah reserve between rounds.

Installation

Building Around a Pad That Is Already Fenced

Outside the fence, in the operator’s sight

The fence is the operator’s work area, and adding hardware inside it complicates every future service call. Set the pole outside the compound where the lease road reaches, high enough that the camera reads the whole pad over the fence line.

One pole that sees the whole pad

A pad is small: wellhead, header, separator, tanks. One camera at the right corner covers most of it, which is why pad points rarely justify a second one. Confirm the sight lines before the footing, and resist adding a second system where one honest angle answers.

Sealed, staked and out of the rut line

Lease roads grow ruts and the vacuum truck will one day cut the corner. Keep the pole clear of the tracked line, the enclosure sealed against dust, and cabling in conduit against the pole where a hose or a ladder cannot find it.

Specific to pads and rights-of-way

Four Things That Only Come Up on a Well Pad

1. The pumper’s round is the service schedule

Pad visits follow the gauge run, and the gap between runs is the real specification for the reserve. A pad seen weekly needs less spare capacity than a valve point seen monthly, and a design that quietly assumes somebody will drop by does not survive a washed-out lease road. Size the reserve from the longest interval the route actually produces, then let the visit be a check rather than a rescue.

2. Brass and copper are the target list

What disappears from remote pads is small, portable and made of metal: gauges, tubing, valve handles, ground wire. The camera exists because the loss is discovered at the next visit, days after it happened. That argues for the reserve and the radio link being treated as first-order equipment, because a point that blinks silently is a point whose footage ends when it matters.

3. One pad, one point, one honest angle

Multi-camera projects grow on big sites where corners hide corners. A pad has four corners and a fence, and the common mistake is doubling hardware to watch hardware. Where a second location genuinely exists, the tank battery or the gate, it usually gets its own pole and its own system, because sharing a long low-voltage run between points costs more than the second array.

4. The right-of-way is a second network

Valve points, crossing markers and line breaks along a right-of-way are far from any pad and any road, which makes them the purest off-grid case in the field. The loads are smaller, the visits rarer and the siting simpler, and the same standard systems carry them. Treating the right-of-way as its own small network, point by point, keeps the arithmetic honest instead of stretching one pad’s design over ten miles of line.

Where the watched ground is a working face rather than a fenced pad, the moving-point notes under solar power for mining site cameras read across. Where the pad line meets the lease boundary, the gate and fence layout under solar power for perimeter fence cameras covers it. And where the field’s comms ride a mast of their own, the site notes under solar power for rural internet towers apply to that pole.

Where the fenced compound holds switch racks rather than process piping, the yard notes under solar power for substation monitoring cover the one-point-sees-all case.

Where the unmanned yard belongs to process equipment, the pad notes under solar power for water pump station cameras read across to the utility side.

What the system does not do: it does not carry process equipment or actuators, does not replace the pad’s own safety systems, and is not rated for hazardous-area duty, so points stay outside any area whose rules demand more than ordinary equipment. It keeps a camera and its radio link alive at a pad no cable reaches, between the visits that are already scheduled.

How long between pumper runs?

Send the pad list, what each point watches and the longest interval on the route. We will size the reserve from that stretch, not from a best-case week.

Send the Site Details
Pad questions

Asked by Operators and Lease Hands

Can one point cover the whole pad?
Usually, yes. A pad is a small rectangle, and a camera at the right corner sees the wellhead, the header and most of the tank side in one frame. The exceptions are long tank batteries and pads with a second compound, and those get their own pole and system rather than a long low-voltage run across the lease.
How is the reserve sized when nobody visits for weeks?
From the interval, not the load. Take the continuous draw, multiply by 24 for the daily need, then check what the array produces in the worst month and how many days the battery can hold between service rounds: 12V times the Ah rating, adjusted for usable depth and conversion losses. A monthly route needs a bigger reserve than a weekly one even when the equipment list is identical.
Can the point go inside the fence?
It can, but it usually should not. The compound is the operator’s work area, and hardware inside it joins every future service call, every vehicle movement and every upgrade discussion. A pole outside the fence, reached from the lease road and looking over the fence line, does the same job without touching the pad’s own routine.
What about points along the right-of-way?
They are the simplest case: smaller loads, rarer visits and no fence to work around. The same sizing method applies, with the reserve taken from the longest realistic interval between patrols. Each valve or crossing point stands on its own pole and carries its own system, because a run between points costs more than the array it would replace.
Next Step

Send the Pad List, Get the Sizes and the Reserve

Tell us what each point watches and the longest gap between visits on the route. We will map them onto standard sizes and quote FOB China. We are not the factory: we supply these standard systems, so where a site genuinely needs something else we will say so.

Plan the points

Pads, device list, pumper round. We will come back with how many systems and which size for each, typically within 24 hours.

Ask Us to Plan It

Check the numbers

Panel, battery, output and bracket for every standard size, on the product pages, so you can run the between-rounds arithmetic yourself.

See the Data

Minimum order 2 pcs · FOB China · Payment is 100% in advance, by T/T bank transfer · Standard models · Typical lead time ~15 days

WhatsApp Email Us